Drill Ships Kanuni

UV-filter-features

UV filter

We have designed and created documentation for the manufacture and installation of a UV filter on the existing ventilation system.

brine-filtration-system-features

Brine filtration system

For the Brine Filtration system we designed the foundations for the equipment, pipeline design, predicted necessary modifications to the existing structure. Made a FEM foundation analysis, sea fastening study. We made complete project documentation for the register and workshop documentation for the construction of the foundations and pipelines.

galli-shutter-feature

Galli shutter

We have made a list of works required to perform the installation of a Galli rollo shutter. We made documentation for modification of the existing structure and workshop documentation for construction of reinforcements.

clean-cut-feature

Clean cut system foundations

For the Clean Cut system, we have designed the foundations for the equipment, pipeline design, predicted necessary modifications to the existing structure. Made a FEM foundation analysis, sea fastening study. We made complete project documentation for the register and workshop documentation for the construction of the foundations and pipelines.

IWOCS-features

IWOCS equipment foundations

For the IWOCS system – we have designed the foundations for the equipment. Made a FEM foundation analysis, sea fastening study. We made complete project documentation for the register and workshop documentation for the construction of the foundation.

HVAC-feature

HVAC Heating upgrade

The ship did not have a heating system at the time. We designed a heating system for the crew accommodation, made project documentation (mechanical, electrical and automation part). All documentation is approved by the register. We deliver the automation cabinet for this project and we have done the commissioning of the complete system. The system …

HVAC Heating upgrade Read More »