BOP LMRP access platforms

We designed and made the workshop documentation for manufacturing and installation of access platforms for BOP and LMRP.

UV filter

We designed and created documentation for the manufacture and installation of UV filter on the existing ventilation system.

Brine filtration system

For the Brine Filtration system we designed the foundations for the equipment, pipeline design, predict necessary modifications to the existing structure. Made a FEM foundation analysis, seafastening study. We made complete project documentation for the register and workshop documentation for the construction of the foundations and pipelines.

Galley shutter

We have made a list of works required to perform the installation of a galley rollo shuter. We made documentation for modification of the existing structure and workshop documentation for construction of reinforcements.

Clean cut system foundations

For the Clean Cut systemwe designed the foundations for the equipment, pipeline design, predict necessary modifications to the existing structure. Made a FEM foundation analysis, seafastening study. We made complete project documentation for the register and workshop documentation for the construction of the foundations and pipelines.

IWOCS equipment foundations

For the IWOCS system_we designed the foundations for the equipment. Made a FEM foundation analysis, seafastening study. We made complete project documentation for the register and workshop documentation for the construction of the foundation.

HVAC Heating upgrade

The ship that did not have a heating system at the time. We designed a heating system for the crew accommodation, made project documentation (mechanical and electrical part). The system is based on thyristor-controlled electric heaters. The total installed capacity is 1,275 MW.